Dedusting, chutes and media piping engineering of project in Leamington, Utah (USA)

Dedusting, chutes and media piping engineering of project in Leamington, Utah (USA) Developed in: USA Date: 2024-2025 LOESCHE, a company specialized in industrial installations, contracted us to develop the detail mechanical engineering for a project in Leamington, Utah (United States): Interconnecting chutes, including compensators. Dedusting ducts. Compressed air piping. Our scope includes 3D modeling, […]
Modification of the bottom of the cement silos 1, 2 y 3 at CEMEX factory in Morata (Spain)

Modification of the bottom of the cement silos 1, 2 y 3 at CEMEX in Morata (Zaragoza) Developed in: Morata de Jalón, Zaragoza (Spain) Date: 2024-2025 INGENOVA is developing for modifying the bottom of cement silos to practically restore their original capacity. The plant has seven silos for storing and shipping bulk and bagged cement. […]
New raw materials project for MICESA in Murcia

New raw materials project for MICESA in Murcia Developed in: Murcia (Spain) Date: 2024-2025 The project includes the calculation of a new raw materials facility in Murcia. The scope of our work is: Calculation and sketches of metal structures and six silos for storage of raw materials. Calculation and detail engineering including fabrication of silo […]
Steel silo design in Port of Barcelona

Steel silo design in Port of Barcelona Developed in: Barcelona (Spain)Date: 2024 Our professional services consisted of the design of a new steel silo for the storage of soybean hulls, including its foundation, for the company TECHNIP in Port of Barcelona. It includes the design, calculation and preparation of a 3D model and arrangement drawings […]
Installation project of a crusher and an analyzer in CEMEX cement factory in Castillejo (Spain)

Installation project of a crusher and an analyzer in CEMEX cement factory in Castillejo Developed in: Castillejo (Spain)Date: 2024-2025 Our services have consisted of the necessary mechanical implementation of structural engineering and contracting specifications for the installation of a new analyzer and a new crusher at the CEMEX cement factory in Castillejo (Toledo). The so-called […]
Foundarion of two new rollers in Hiemesa (Barcelona)

Foundation of two new rollers in Hiemesa (Barcelona) Developed in: Barcelona (España) Date: 2024 Our services included the civil engineering of the foundations for two new rollers at the HIEMESA plant in the Free Trade Zone of the Port of Barcelona, as well as their auxiliary equipment (planer extractors, hydraulic unit, etc.) The work performed […]
Design and calculation of flotation tanks and hydrocyclone verification

Design and calculation of flotation tanks and hydrocyclone verification Developed in: IranDate: 2024-2025 In this project, we have carried out different engineering services for the verification of the structural design criteria of the specifications of the steel structures. We have also performed the static and dynamic calculation of a hydrocyclone and three sets of flotation […]
New enerfuel unloading line project for the CEMEX factory in Morata

New enerfuel unloading line project for the CEMEX factory in Morata Developed in: Spain Date: 2024 Ingenova developes the engineering for the new enerfuel reception and transportation facility in the factory that CEMEX Spain has in Morata de Jalón (Zaragoza). This engineering consists of the foundations for the reception and transportation of the new line; new […]
Structural calculation in Bacau (Romania)

Structural calculation in Bacau (Romania) Developed in: Romania Date: 2024 Ingenova expands its field of action by collaborating with another Zaragoza company THELEISUREWAY, specialized in the architecture of leisure areas in shopping centers, to carry out this work in the city of Bacau (Romania). This project consisted of the structural calculation of a […]
Two additions silos project for CEMEX in Castillejo

Two additions silos project for CEMEX in Castillejo Developed in: Castillejo (Toledo) Date: 2024 Ingenova developes the engineering of the new installation of two additions silos at CEMEX’s factory in Castillejo (Toledo). This engineering consists of: the implementation, mechanical and civil engineering of two 1000Tn metal silos including their support structure, maintenance platforms, foundation and […]