Date: 07-2022

 

Ingenova has been contracted by CEMTEC for the development of the civil and basic-detail structural engineering for the second cement grinding line.

 

CEMTEC Cement & Mining Technology supplied a grinding plant in Tema (Ghana) for its client CIMAF 3 years ago, in a project called GHANCEM. Now CIMAF plans to increase the capacity of the plant.

 

Our company developed the plant first phase in 2016 and is currently participating in the second line that includes a clinker silo, a grinding unit cement silos and connections to the existing line. Our services consist of carrying out the basic and detail engineering of the foundations, silos and metal structure of the plant.

Trabajando con CEMTEC en el proyecto Ghanex